VC03 - Outdoor tile & stone adhesive, swimming pools and large tiles/stone

• Characteristics:

Very high ductility and adhesion performance Use for all sizes of bricks and stones. Use time after mixing 1-2 hours Mixed form after mixing: Gray gray

• Quota:

Norm: 20kg/ 3-5m2

Required amount of water: 5-6 liters/bag of 20kg

• Meet Vietnamese standards TCVN 7899-2-2008 and ISO 13007-2-2005

 

Đóng gói: 20kg/bao

Màu sắc: White

PRODUCT DESCRIPTION:

Vicin (VC03) tile adhesive is a prepackaged cement-based product, manufactured on modern production lines according to the additive formula of Thailand. Selected raw materials, improved flexibility, modified with high performance polymer with increased adhesion and anti-slip properties. When mixed with water, the Mortar/Glue has very high plasticity and adhesion. The product meets Vietnam quality standards 7899- 2:2008 and ISO 13007-2:2005.

ỨNG DỤNG:

  • Sản phẩm chuyên phục vụ công tác Ốp Lát gạch Ceramic, Mosaics, Gốm, Đá tự nhiên có kích thước lớn.
  • Sản phẩm tiêu chuẩn lý tưởng khi cần thời gian làm việc lâu hơn và cho các khu vực có điều kiện ẩm ướt kéo dài hoặc vĩnh viễn như bể bơi, spa, phòng xông hơi… 

TECHNICAL SPECIFICATIONS AND FEATURES OF TILE ADHESIVE -  VC03

  • Bonded

Flour, White - Gray color

  • Mixing water ratio

33%

  • Adhesion strength at standard conditions

1,8 Nmm2

  • Adhesion strength after immersion in water 

0,5 N/mm2

  • Adhesion after heat aging 

1,6 Nmm2

  • Open time

20 minutes

  • Slip

0,1mm

  • Thời gian cho phép chà mạch

4-6 hours

  • Time allowed to travel after construction

After 24 hours

CONSTRUCTION SURFACE PREPARATION:

- The construction surface must be flat, firm, clean, free from grease, dirt and other impurities... - If applying in conditions of high temperature and direct sunlight, it is necessary to water to reduce the temperature of the surface and at the same time carry out curing after completion of construction.

MIXING AND CONSTRUCTION PRODUCTS:

- Need 5-6 liters of clean water (or adhesive strengthening solution) into the bucket, slowly pour in the glue powder and mix well.

- Using a slow speed mixer, mix until the product has a uniform plasticity, stop mixing for about 3-5 minutes for the product to react chemically, mix again and then apply.

- Use a serrated trowel to evenly apply the glue mixture to the construction surface, creating a layer of thickness of 2-5 mm to increase the contact area between the brick surface and the construction surface, to avoid peeling and cracking of the brick.

- Place and align the tiling material, use a rubber hammer   (or a generator) to knock evenly on the surface of the tiling material to ensure that the material is glued evenly and firmly.

PRESERVATION:

- In a dry place, do not put on the floor, do not stack more than 10 bags. (HSD 12 months).

Projects

Diplomatic Corps area is a large-scale, modern urban area, meeting international standards. Built right in Xuan Tao commune, Bac Tu Liem District, Hanoi. The urban area is located at a convenient traffic location and this is also the political and economic development area of ​​Hanoi. Thanks to the prime location, through the main road Nguyen Van Huyen helps people in this area more convenient for moving, buying and selling, easily connecting to the city center and the airport.
The project to renovate the office area - Ministry of Defense is part of a series of projects to upgrade and improve the quality of floors and tiling of state buildings of Vicin Vietnam. Trusted and selected by state agencies and leading enterprises. Vicin clearly recognizes the mission and responsibility to bring new life to each project. This is a high-class project and gives Vicin the pride of being always selected and appointed to execute a package for large-scale projects.
Vinhome Royal City of Vingroup is likened to a miniature "European city", Royal City is a perfect urban complex where you can enjoy the exciting experiences of a comfortable life. in green, clean and safe space.
Noi Bai International Airport has carried out the repair, renovation and upgrading of passenger terminal T1 starting from July 11, 2017 to March 2018. In order to improve the quality of passenger service and increase the operating capacity of passenger terminal T1 to serve 15 million passengers/year.
One of the projects is Vicin's pride when selected to provide high-class tile adhesives for the construction of Government Offices. Affirming the position of Vicin Vietnam brand in the market. Vicin Vietnam perfectly meets the most stringent requirements for quality, ensuring high aesthetics, Solidity and durability over time.

Giải pháp kỹ thuật

Lát gạch trên sân thượng hoặc tường ngoài trời

VICIN Việt Nam là đơn vị cung cấp dòng sản phẩm keo dán gạch và keo chà mạch trong Dự án cải tạo và nâng cấp Nhà ga T1, Cảng hàng không quốc tế Nội Bài. Với những tiêu chí về chất lượng hàng đầu, yêu cầu khắt khe về tính thẩm mỹ, độ bền, an toàn và ổn định, keo dán gạch Vicin đáp ứng hoàn hảo được các yêu cầu của dự án.

Thi công lát gạch ở siêu thị, bãi đậu xe, nhà máy

VICIN Việt Nam là đơn vị cung cấp dòng sản phẩm keo dán gạch và keo chà mạch trong Dự án cải tạo và nâng cấp Nhà ga T1, Cảng hàng không quốc tế Nội Bài. Với những tiêu chí về chất lượng hàng đầu, yêu cầu khắt khe về tính thẩm mỹ, độ bền, an toàn và ổn định, keo dán gạch Vicin đáp ứng hoàn hảo được các yêu cầu của dự án.